“I had the pleasure of working with Meco-Henne as the general contractor on a renovation of the oldest building on the UNO campus. Meco-Henne Project Manager/ Superintendent Nick Jones and his team made a project that would otherwise have been a nightmare into a very successful award winning, on-time and under budget project.
The Arts and Sciences Hall (ASH) on the UNO campus is just under 100 years old and, as with any building that age, was chocked full of surprises. The original scope of the project was anything but simple; completely replace the aging infrastructure within the building, rework the main restrooms, “refresh” all corridors and classrooms, oh and Don’t Shut The Building Down. However, due to some unexpected budget windfalls, the project ended up with excess funds roughly 3 months into construction and thus the scope grew. The University decided to use these funds to do “as much as possible” with what they had. What ensued was a whirlwind of user group meetings, pricing requests, change orders, and design on the fly upgrades. Throughout all of this Nick and his team kept things organized helped us focus the users and kept the project moving along smoothly. What started as a design-bid-build project model morphed into a design-build/CMAR style of project and they handled the transition wonderfully.
None of this would have been possible without solid lines of communication between the Meco Henne, the design team, and the University. Communication was started very early on in the project allowing efficient and judgement free discussions throughout the entire construction process. At some point it seemed that every wall that came down or chase that was opened a new issue was identified. Nick made sure that he immediately alerted any interested parties to get the balling rolling on a solution, often already having a proposed solution prepared.
The quality of work I observed on-site was exceptional. Nick and his crew held themselves to a very high standard and ensured others on-site did as well. During final inspections it was difficult to even find anything wrong, but the superintendent would be sure to point out even the smallest of things. Little issues that he had previously identified and was already in the process of getting fixed.
Having a partner like Meco-Henne on the ASH project was a necessary part of its success. I look forward to working with Meco-Henne in the future and fully recommend them and their work.”